Work to complete 80-km section of Pak-Iran gas pipeline starts

0

With Iranian President EbrahimRaisi’s expected visit to Pakistan on April 22, authorities have commenced the work to begin the construction of the 80-kilometre section of the Pakistan-Iran gas pipeline from Gwadar to a point where it can be connected with the Iranian section of the project, reported an English daily on Sunday.

As per the publication, citing a senior official of the Energy Ministry, the Inter-State Gas Company (ISGS) has already issued tenders seeking the much-delayed re-validation of survey and Front-End Engineering Design (FEED) by consultants.

The development comes amid the United States’s explicit opposition to the bilateral project, coupled with warnings of potential sanctions, which has faced a nearly decade-long delay as it was set to be completed in December 2014 followed by its operationalisation in January 2015.

Over the years, Pakistan maintained that it could not materialise the project in its territory because of the US sanctions imposed on Iran, a view which authorities in Tehran have never subscribed, saying the US sanctions are not justified.

Read more: https://pakobserver.net/work-to-complete-80-km-section-of-pak-iran-gas-pipeline-starts/

Leave a Reply

Your email address will not be published. Required fields are marked *